Bathroom Remodel Cost Guide

Focused updates like a tub-to-shower conversion often run $6,500–$12,000. Full gut remodels commonly fall between $12,000 and $22,000+, depending on fixtures and layout changes.

Typical remodel range

$6,500–$22,000

Updated August 2026

Bathroom projects deliver daily comfort and strong resale appeal when done well. Scope is everything: swapping a vanity is a very different job from moving a shower drain or opening a wall for a new layout.

The biggest cost drivers are wet-area waterproofing, plumbing moves, tile labor, and fixture grade. Labor-heavy markets and custom glass can stretch budgets quickly.

What drives the price

01

Scope of work

Cosmetic refreshes (vanity, toilet, paint, lighting) cost far less than full gut jobs that replace everything behind the walls in the wet zone.

02

Plumbing and layout

Keeping fixtures in the same footprints saves money. Moving a toilet, shower valve, or drain can add thousands in labor and materials.

03

Shower systems and tile

Acrylic/fiberglass surrounds are faster and cheaper. Custom tile with niche, bench, and linear drain looks premium—and is labor intensive.

04

Fixtures and finishes

Builder-grade faucets and lighting vs. designer brands can swing the budget by thousands without changing the construction scope much.

Cost breakdown

National planning ranges. Local labor, permits, and material availability will shift these numbers.

Tub-to-shower conversion

Popular accessibility / low-maintenance upgrade

$6,500–$12,000

Walk-in tub install

Unit cost varies widely by features and brand

$5,000–$15,000

Mid-range full remodel

New fixtures, tile or surround, vanity, lighting

$12,000–$22,000

Upscale / custom bath

Layout changes, custom tile, premium glass and stone

$25,000–$45,000+

Vanity + faucet refresh only

If plumbing stays put and finishes are simple

$800–$3,500

Typical timeline

A straightforward tub-to-shower conversion may take a few days to a week. Full remodels often run 2–4 weeks depending on tile dry times, glass lead times, and inspection schedules.

Tips before you hire

  • Decide early: keep the tub, convert to shower, or go dual-function. Layout drives price.
  • Ask how the wet area will be waterproofed—membrane systems matter as much as pretty tile.
  • Order glass and specialty fixtures early; lead times stall otherwise-finished jobs.
  • Plan ventilation. A strong exhaust fan protects your new investment from moisture damage.

Common questions

Is a tub-to-shower conversion worth it?

For many households, yes—especially if no one uses the tub. It’s easier to clean, can feel larger, and supports aging-in-place goals. Keep a tub if resale buyers in your market expect one.

What is the biggest surprise cost?

Hidden water damage, out-of-level floors, and plumbing that doesn’t meet current code once walls are open. A contingency of 10–15% is smart.

Can I remodel in phases?

Yes—start with the wet area, then vanity and lighting. Just design the full look first so finishes match when you complete later phases.